Skip to content Skip to navigation

15th July National Struggle Museum and Parking Lot Construction

The museum and the parking lot structure consists of 3 main floors and 1 mezzanine floor. The 2nd basement floor and the 1st basement floors are parking floors, and 801 vehicle parking lots were calculated and projects were designed accordingly. 2. Basement floor area is 16.135 m2 and 1. Basement floor area is 15.552 m2